Wind and solar energy curtailed, as % of possible generation, over the last 12 complete months of each country, by each operator's own definition.

Curtailment as % of possible generation — last 12 complete months of each country Curtailment as % of possible generation — last 12 complete months of each country Wind Solar 0% 10% 20% 30% Brazil Brazil · Wind · 11/2025–10/2026: 20.61% (26.73 TWh of 129.71 TWh) — ONS: estimated reference generation minus actual, per plant cluster and half hour, only under an operating restriction (energy, reliability or external grid) 20.6% Brazil · Solar · 11/2025–10/2026: 26.02% (12.98 TWh of 49.90 TWh) — ONS: estimated reference generation minus actual, per plant cluster and half hour, only under an operating restriction (energy, reliability or external grid) 26.0% 11/2025–10/2026 · ONS · 12 complete months Chile Chile · Wind · 10/2025–09/2026: 12.98% (1.73 TWh of 13.36 TWh) — CEN: published 'reducción' per variable-renewable plant and hour (monthly curtailment report); CEN does not publish the cause 13.0% Chile · Solar · 10/2025–09/2026: 22.90% (3.71 TWh of 16.21 TWh) — CEN: published 'reducción' per variable-renewable plant and hour (monthly curtailment report); CEN does not publish the cause 22.9% 10/2025–09/2026 · CEN · 12 complete months Argentina Argentina · Wind · 08/2025–07/2026: 0.99% (186.5 GWh of 18.76 TWh) — CAMMESA: reduced energy published in the monthly Variable Renewable Generation report (sum of regions); generation from CAMMESA's GRV database 1.0% Argentina · Solar · 08/2025–07/2026: 4.86% (296.8 GWh of 6.10 TWh) — CAMMESA: reduced energy published in the monthly Variable Renewable Generation report (sum of regions); generation from CAMMESA's GRV database 4.9% 08/2025–07/2026 · CAMMESA · 12 complete months

Peru enters when COES completes 12 months (series since 2026-04-17; 6 complete months today).

What each operator calls curtailment

Four operators, four similar but not identical definitions: Brazil and Argentina start from an estimated reference; Chile and Peru publish the curtailed energy already computed. No number was recomputed to equalize methods.

Download the data (JSON, curtailment and generation in MWh)

Numbers: measured in PROD 2026-11-27 01:50 BRT; window 2024-11 to 2026-10. Sources: ONS, CEN, CAMMESA and COES (public data); BrazilGrid consolidation. Metric: curtailment ÷ (actual generation + curtailment).

Method, full definitions and caveats

Common metric: curtailment ÷ (actual generation + curtailment), by source and month. Each country's curtailment is that country's operator figure, read as published (each definition below); generation is that of the same plants.

What each operator calls curtailment

Brazil

Operator
ONS — Brazilian National System Operator
Definition
Curtailment = ONS estimated reference generation minus actual generation, summed per plant cluster and half hour, only in half hours with an operating restriction (constrained-off) classified by ONS: ENE (energy, oversupply), CNF (electrical reliability) or REL (external grid unavailability). It is the basis of the gridCurt counter and reproduces the ONS GNRa. It covers wind and solar plants dispatched by ONS; distributed generation is out.
Resolution
30 min
Series published since
2021-10-01
Latest data published
2026-11-25
On this page
24 complete months (2024-11 to 2026-10)
Alternative measure, taken together
Per-plant sum (GREATEST(estimated − actual, 0), same reason filter). Slightly higher because summing per plant does not net a plant above against one below its reference: a method difference, not extra lost energy. In 2026-10: wind 22.94% and solar 29.70% by that measure, against 22.49% and 29.27% in the table.
Source
ONS, dados abertos: restricao de operacao por constrained-off de usinas eolicas e fotovoltaicas (semi-horario); consolidacao BrazilGrid (dados_sin.agg_fonte_mensal)

Chile

Operator
CEN — Chile's National Electric Coordinator
Definition
Curtailment = 'reducción' published by CEN, per variable-renewable (ERV) plant and hour, in the monthly report "Reducciones de Energía Eólica, Solar e Hidro en el SEN". CEN publishes the curtailed energy already computed and does not publish the cause (grid and oversupply are not split). Included: report plants identified in the CEN registry, only in hours with published generation; generation is that of the same plants in the same hours. Distributed generation (PMGD) is not in the report. Each month arrives about two months later.
Resolution
1 h
Series published since
2022-01-01
Latest data published
2026-09-30
On this page
22 complete months (2024-11 to 2026-09). 2024-12: partial (30 of 31 days); 2026-10: not published
Alternative measure, taken together
TOTAL reduction published by CEN per source (the file's "Resumen-Mensual"), including report plants we could not identify in the registry (about 4% of wind and 10% of solar curtailed energy), over the same generation: slightly overstated. In 2026-09: wind 16.93% and solar 26.23% by that measure, against 16.53% and 23.88% in the table.
Source
Coordinador Eléctrico Nacional (CEN), Reducciones de Energía Eólica, Solar e Hidro en el SEN (XLSX mensal); geracao horaria do CEN

Argentina

Operator
CAMMESA — Argentina's wholesale electricity market administrator
Definition
Curtailment = 'Energía Reducida' published by CAMMESA in its monthly Variable Renewable Generation report (sum of the regions in the monthly summary). CAMMESA computes possible minus generated power of each wind or solar park from 10-second signals, only while a transmission saturation or a frequency-control reduction is active — the same structure as Brazil (reference minus actual, filtered by the restriction). Generation = monthly net generation from CAMMESA's GRV database. With it, the % here reproduces the one printed in the report up to March 2026; from April 2026 the report's summary box repeats March's generation (1,627 GWh wind, 542 GWh solar) and the printed % falls below the one here. Most of it comes from grid restrictions (lines, transformers, regional export limits); the rest from frequency control, islanded operation of Patagonia and system faults.
Resolution
mensal (a CAMMESA calcula com sinais de 10 s do SOTR)
Series published since
—
Latest data published
2026-07-31
On this page
21 complete months (2024-11 to 2026-07). 2026-08: not published; 2026-09: not published; 2026-10: not published
Alternative measure, taken together
BrazilGrid calculation on CAMMESA's hourly Post-Operation Report: 'posible' minus generated energy, per group and hour, in hours with a recorded restriction, over the same generation. It does not reproduce the report by source (whole hours and the Report's list of groups differ from CAMMESA's 10-second calculation); kept as a second reading. In 2026-07: wind 0.29% and solar 0.36% by that measure, against 0.47% and 1.36% in the table.
Source
CAMMESA, Informe Mensual de Generacion Renovable Variable (energia reducida por regiao) e Base de Datos GRV (geracao neta mensal)

Peru

Operator
COES — Peru's system operator
Definition
Curtailment = 'vertimiento' of wind and solar renewable (RER) plants published by COES in the VERTIMIENTO RER sheet of the daily operation report (IEOD), per plant and half hour. Per the COES Glossary (Osinergmin Res. 003-2025-OS/CD), it is the energy zero-variable-cost plants could not generate for lack of transmission capacity or because zero-cost generation exceeded demand. The sheet exists since 2026-04-17: the series is short. An empty cell counts as zero, as in COES's own 'Total diario'; a day without the sheet drops the whole month. Generation is the executed wind and solar dispatch from the same report.
Resolution
30 min
Series published since
2026-04-17
Latest data published
2026-11-25
On this page
6 complete months (2026-05 to 2026-10). 2024-11: not published; 2024-12: not published; 2025-01: not published; 2025-02: not published; 2025-03: not published; 2025-04: not published; 2025-05: not published; 2025-06: not published; 2025-07: not published; 2025-08: not published; 2025-09: not published; 2025-10: not published; 2025-11: not published; 2025-12: not published; 2026-01: not published; 2026-02: not published; 2026-03: not published; 2026-04: partial (13 of 30 days)
Alternative measure, taken together
None: COES publishes a single figure.
Source
COES-SINAC, Informe de Evaluacion de la Operacion Diaria (IEOD), AnexoA: abas VERTIMIENTO RER e DESPACHO EJECUTADO

Comparability caveat

  • The four operators measure similar, not identical, things. Brazil and Argentina start from an estimated reference generation (what the plant would have produced) and subtract what it produced, in restricted hours; Chile and Peru publish the curtailed energy already computed, per plant, with their own methodology. No number on this page was recomputed to 'level' the methodologies.
  • The denominator is the same for all four: actual generation of the same plants plus curtailment. That is why the % here differs from gridCurt (curtailment ÷ estimated reference generation, rolling 12 months); for Argentina it is the same % as CAMMESA's report (curtailment ÷ possible energy) up to March 2026.
  • Scope: Brazil = plants dispatched by ONS; Chile = plants in CEN's ERV report; Argentina = wind and solar parks in CAMMESA's GRV report; Peru = COES renewable (RER) plants. Distributed generation is out in all four.
  • Cause: Brazil only counts curtailment with an ONS-classified reason (energy, reliability, external grid); Argentina records each order's description; Chile does not publish the cause; Peru defines 'vertimiento' as lack of transmission or oversupply. A higher % alone does not mean a country's grid is worse: the size of the renewable fleet relative to demand weighs as much as transmission.
  • Only complete months count. A month not published, or with an unpublished day, is left out (dash in the table), never shown as zero; a zero in the table is a zero published by the operator. Chile arrives about two months late; Argentina about five weeks late (CAMMESA's monthly report); Peru starts in May 2026 (April was partial).
BrazilGrid's own research on public data from four operators (ONS, CEN, CAMMESA, COES), with each definition stated. It is a starting point, not the final word: validate with your own data and do not read anything here as investment advice.